1920-1-10 Two men standing in front of the first building to be demolished. The man on the left can be seen in several pictures. The man on the right can be seen throughout the project behind a surveyor's transit.
1920-02-19 Under Walnut St Bridge looking East YMCA was canal warehouse. Section1
1920-02-19 looking East under Walnut St Bridge. Section1
1920-02-26 Building being demolished.
1920-02-26 Section2
1920-02-26 Section2
1920-02-27 Canal St Looking N/E from under Walnut St Bridge. Section1
1920-02-27 Looking East at Canal Warehouse Walnut St Bridge. Section1
1920-02-27 Looking West towards Walnut St bridge. Section1
1920-02-27 East of Walnut St Building Drain line. Section1
1920-02-27 Looking North towards Clay St. Section1
Looking East at Main Street fill after Canal and Bridge removal. Section 1
1920-02-27 Setting up Drag looking S/W towards Walnut St Bridge. Section1
1920-02-27 Setting up Drag looking S/W towards Walnut St Bridge. Section1
1920-02-27 East of Walnut St Building Drain line. Section1
2-27-1920 Looking East zoomed in from under Walnut Street Bridge . Section1
1920-03-05 looking N/W towards Walnut St Bridge. Section1
1920-03-05 looking N/W towards Walnut St Bridge. Section1
1920-03-05 looking N/W towards Walnut St Bridge. Section1
1920-03-05 looking North, Walnut St Bridge West of Bridge. Section1
1920-03-05 Looking N/E towards Walnut St Bridge.Section1
1920-03-05 Looking West Walnut St Bridge. Section1
1920-03-05 Drag line looking South towards Music Hall. Section2
1920-03-05 looking South towards Music Hall. Section2
1920-03-08 Drag line Section2
1920-03-08 Drag line Section2
1920-03-08 looking S/E. Section2
1920-03-08 Looking North Section2
1920-03-15 Canal fill Section 1 East of Sycamore St.
1920-03-15 Looking West from Sycamore St showing fill dirt Section1
1920-03-15 Looking West from Main Street Bridge removed street completed Section 1
1920-03-15 Looking West Section1
1920-03-15 Walnut Street Bridge Looking North Section1
1920-03-17 Corner near Eggleston Elbow before fill dirt looking East Section1
1920-03-17 Looking North Race St Bridge Section1
1920-03-17 Looking West Section1
1920-03-17 Looking West. Section1
1920-03-17 Looking N/W Elm St Bridge. Section1
1920-03-17 Looking West at Plum St Elbow Section1
1920-03-17 Looking North of Plum Street Elbow. Section1
1920-03-17 Looking N/E towards Music Hall. Section2
1920-03-17 Looking North. Section2
1920-03-17 Looking South. Section2
1920-03-26 looking South. Section2
1920-03-26 Looking South. Section2
1920-03-26 Looking East towards Walnut St. Section1
1920-03-27 Looking S/W towards Vine St Bridge. Section1
1920-03-30 Wall collapse. Section1
1920-03-30 Section1
1920-03-30 Section2
1920-04-01 Looking East from Near Plumb St. Section1
1920-04-01 Looking East Elm St. Section1
1920-04-02 Looking East. Section1
1920-04-02 Section1
1920-04-02 Looking East Towards Walnut St Bridge showing the partial demolition of the Canal Warehouse. Section1
1920-04-03 Looking East Model Laundry Company main office. Walnut St Bridge. Section1
1920-04-05 Looking North towards Walnut Street Bridge. Section1
1920-04-05 1920-04-05 Looking North towards Walnut Street Bridge. Section1
1920-04-09 Looking East Towards Walnut Bridge between Canal warehouse Building and street buildings. Section1
1920-04-09 First section of Metal work for Subway floor to be poured. Section1
1920-04-09 The first section of the subway floor metalwork being prepared for pour. East of Walnut Street Bridge being demolished. Section1
1920-04-09 Looking West. Section1
1920-04-09 Looking North. Section2
1920-04-09 Looking North. Section2
1920-04-09 Looking North. Section2
1920-04-09 Looking North. Section2
1920-04-09 Looking North. Section2
1920-04-09 looking South. Section2
1920-04-09 looking South. Section2
1920-04-09
1920-04-21 Looking East after a weeks rain. Section1
1920-04-21 West from Vine St Bridge after a weeks rain. Section1
1920-04-21 Grant St. Section2
1920-04-21 Laurel St West of Canal. Section2 Looking at back of Music Hall
1920-04-21 14th St West of Canal - August Hermes Grocery. Section2
1920-04-21 North East Corner Canal E Race
1920-04-21 1st concrete East of Walnut. Section1
1920-04-21 Demolition Walnut St bridge. Section1
1920-04-22 first concrete East of Walnut St. Section1
1920-04-22
1920-04-22 Odeon St. Section2
1920-04-22 15th St. W. Abutment. Section2
1920-04-22 after weeks rain. Section2
1920-04-22 15th St W of Canal. Section2
1920-04-22 Wade St. E. of Canal. Section2
1920-04-22 N from Liberty St. Section2
1920-04-22 15th St W of Canal. Section2
1920-04-22 Charles St E of Canal. Section2
1920-04-29 14th E of Canal. Section2
1920-04-29 Magnolia St. Section2
1920-04-29 West About 15th St. Section2
1920-04-29 East Abutment 15th St. Section2
1920-04-29 North from 15th St. Section2
1920-04-29 North of 15th. Section2
1920-04-29 Walnut St North Abutment removed. Section1
1920-05-01 Elm St Henshaw Furniture looking North across the bridge. Section1
1920-05-01 West of Vine. Section1
1920-05-01 Drag across Race St. Section1
1920-05-04 East About 15th St. Section2
1920-05-04 East Abutment 15th St. Section2
1920-05-04 North from 15th St. Section2
1920-05-04 Canal outlet below Ludlow Ave.
1920-05-04 Ludlow Ave. Dam
1920-05-05 East of Walnut St. beginning of the "Y" Section1
1920-05-05 Cut West of Race St. Section1
1920-05-14 Footing for expansion joint. Section2
1920-05-14 Damage done by Kids Liberty St. Section2
We use cookies to improve your experience on our website. By browsing this website, you agree to our use of cookies. Read more about our Privacy Policy.